On-site and suitable pre-install application to structural steel in accordance with the accepted project scope and selected system documentation.
Intumescent coating applied during construction and coordinated with steel erection, access, follow-on trades, inspection and programme requirements.
Preparation and coating for refurbishment, upgrades and defined remedial scopes, subject to information about the existing substrate, coating system and required project outcome.
Agreed WFT and DFT checks, application-condition records and product information prepared for project-team review and handover.
We review the available fire strategy, structural information, member schedule, coating specification, programme and access requirements with the project team.
Where required, we inspect accessible steel, existing coatings, contamination, damage, access constraints and conditions that may affect preparation or application.
The selected system is applied in planned coats. WFT readings and required application conditions are checked at agreed stages, with DFT measured after sufficient drying or curing.

Planned delivery, site coordination and defined records aligned with the agreed work scope and construction programme.
On-site and suitable pre-install application, coordinated with handling, connections, site repairs and final inspection.
Clear technical queries, programme updates and application records to support informed project decisions.