Fire-resistance periods, member information and system requirements reviewed before application.
Relevant site conditions and wet coating build recorded during the agreed application scope.
DFT assessed after sufficient drying against the accepted member-specific schedule, where included in our scope.
Records prepared to show the materials, checks and work areas covered by the agreed FireCoatings scope.

Accepted fire-resistance requirements and member information
Selected system documentation and field of application
Application, inspection and handover records for our scope
Available drawings, schedules, access requirements, steel condition and project constraints are reviewed.
The accepted system, member schedule, application targets and responsibilities are confirmed before work begins.
The preparation method is agreed from the substrate condition, existing coatings and selected system requirements.
Coatings are applied in controlled coats, with relevant application checks and records completed for the agreed scope.