Complete Compliance Records

Documentation built throughout your project ensures regulatory approval and long-term confidence.

Your compliance records remain essential long after project completion.
Records

What We Deliver

Every project generates a complete compliance pack. These records verify that materials, application methods and inspection standards have been met throughout the work.
Request Quote

Layer-by-Layer Verification at Each Stage

Substrate condition, surface preparation and coating application are recorded systematically. Each inspection point is documented with photographs and measurements to create an auditable trail.

Wet Film Thickness Monitoring Throughout Application

WFT measurements are taken continuously during application and logged against specification requirements. These records prove that fire-rating performance has been achieved across all protected elements.

Environmental Records During Application

Temperature, humidity and surface conditions are logged throughout the project. These records confirm that application took place within the parameters required for product performance and adhesion.

Full Traceability of Products & Batches

Every product used on site is recorded with batch numbers, certificates of conformance and technical data sheets. This ensures full accountability and supports any future warranty or performance queries.

Statements of Conformance to Standards

Final certification confirms that the fire protection system has been designed, applied and inspected in accordance with Approved Document B, BS 476 and relevant EN standards.

Regulatory Approval & Building Control Acceptance

Our documentation package is structured to meet building control requirements and accelerate sign-off. Clear, comprehensive records reduce queries and enable swift approval of the fire protection works.

Excel spreadsheet showing intumescent coating specifications with columns for Date, Location/Beam Ref, and Specified WFT in micrometers for beams and columns with specific dimensions and sidedness.

How Documentation Supports Your Obligations

Auditable records demonstrate that legal and technical obligations have been met. This protects your project, satisfies insurers and provides confidence to all stakeholders.

Building control approval and sign-off

Insurance and warranty requirements

Audit readiness and regulatory defence

Timeline

Records Built in Real Time

Wet Film Thickness (WFT) is one of the most critical controls in structural steel fire protection. It directly determines whether an intumescent coating will perform as tested, achieve the required fire-resistance period, and meet regulatory approval. Without accurate WFT control, even the best fire-protection products cannot deliver their certified performance.
Legacy

Documentation That Endures

Your compliance records remain essential long after project completion.
Request Quote
Excel spreadsheet showing dates, ambient temperature, relative humidity, due point, steel temperature, application method, and product used from September 10 to 14, 2025.

Maintenance & Refurbishment Made Straightforward

When your building undergoes inspection, maintenance or refurbishment, complete fire protection records eliminate guesswork and reduce costs. Building owners and contractors can verify what has been protected, to what standard and when, enabling informed decisions on any additional works required.

Specialist Application Ensures Fire Safety

WFT measurement and verification are non-negotiable in compliant fire protection. Accurate thickness control, environmental monitoring and structured records are what separate verified fire performance from unproven application. This level of control can only be delivered by trained, competent contractors operating within defined quality systems.
Worker in protective suit and mask applying white fire-resistant coating to ceiling steel beams in an industrial building.
Hand in black glove holding a blue infrared thermometer showing 20.1°C and a black temperature and humidity meter showing 18.5°C, 73.2% relative humidity, and 13.6°C dew point.
Assurance

Compliance & Accountability at Every Stage

We prioritise wet film thickness control, environmental logging, product traceability and layer-by-layer inspection throughout application. Comprehensive documentation ensures building control approval, insurance acceptance and assured project sign-off.
Graco 695 XT airless sprayer with a yellow bucket in an unfinished industrial interior with metal framing and construction equipment.
Hand in black glove holding a blue infrared thermometer showing 20.1°C and a black temperature and humidity meter showing 18.5°C, 73.2% relative humidity, and 13.6°C dew point.
Interior construction site with yellow steel support beams surrounded by red safety barriers and exposed ceiling ducts and wiring.
Featured Projects

Steel Fire Protection Delivered

Representative projects demonstrating our methodology across sectors and steel types.
eyebrow
"Thank you Myles and team for all your hard work on this one. It wasn't easy working around the schedule but you got it done without causing any further issues. It was a pleasure to work with you."
Chris
Project Manager, Millcroft Services
Interior view of a construction site featuring steel beams and columns painted with white protective coating and temporary support props.
eyebrow
"NuColour worked efficiently around our programme and delivered a on time at late notice. The team were organised, flexible, and professional throughout the works."
Ciprian
Site Manager, Principal Contractor – GEMCO
Close-up of a bright yellow structural steel column with rivets installed on a construction site indoors.