



We measure steel sections, assess substrate condition and determine fire-rating requirements. Environmental factors and existing coatings are evaluated to inform specification.
Substrate is prepared using the appropriate method—dry ice blasting, shot blasting, mechanical abrasion or cleaning—to ensure adhesion and coating integrity.
Multi-coat systems are applied with continuous WFT monitoring. Environmental conditions are logged throughout to maintain performance standards.
Final WFT verification, product traceability records and compliance documentation are issued. Your project is signed off and ready for building control approval.
Our fire protection services in West Ham, London are designed to support projects where safety, compliance, and quality are critical. We work closely with main contractors, consultants, and facilities teams to ensure every system is installed correctly and performs as intended.
Our services include:
Every project is delivered in line with manufacturer specifications, current fire safety standards, and project-specific requirements.
NVQ qualifications supporting competent leadership and technical oversight.
SMSTS-qualified management overseeing site safety and project delivery.
NEBOSH-qualified expertise supporting our health and safety management systems.
IPAF-certified operatives ensuring safe and compliant access equipment use.

CHAS Gold demonstrates our commitment to the highest standards of health, safety, and compliance across all projects

Our apprenticeship programme develops skilled professionals through structured training pathways, supporting long term workforce capability, consistent standards, and the safe, effective delivery of our specialist services.
We take a professional, methodical approach to every project, ensuring our clients receive dependable outcomes and long-term compliance.



Pricing for intumescent fire protection in West Ham is influenced by factors such as section sizes, fire resistance period, substrate condition, and whether the work is carried out on-site or off-site. In London, many projects also require phased works or out-of-hours access, which can affect programme and cost. We provide clear, itemised quotations so contractors can plan with confidence.
Fire protection for structural steel in West Ham is tightly regulated and must be installed in strict accordance with tested and approved systems. Across London, we support main contractors and consultants by delivering fully documented, compliant installations that stand up to inspection and final approval.
In West Ham, projects across London often require different fire resistance periods within the same structure. These variations must be carefully managed through accurate measurement, specification, and controlled application to ensure each steel member performs as intended in a fire scenario.
In West Ham, pre-install application can offer quality and programme advantages, while on-site application allows flexibility for complex or phased builds. The right choice for projects in West Ham depends on sequencing, handling, and coordination with the steelwork contractor.
In West Ham, poor preparation is one of the most common causes of coating failure. That’s why every project in West Ham begins with a proper assessment of steel condition and the correct preparation method to ensure adhesion, durability, and long-term performance.
In West Ham, across London, we regularly work in occupied or partially operational buildings. Careful planning, containment, and sequencing allow us to integrate our works safely and cleanly into complex live environments.
In West Ham, poor sequencing can cause delays, rework, and access issues. Across London, we coordinate closely with main contractors and steelwork teams to ensure fire protection is delivered at the right time and in the right order.
In West Ham, building control and fire engineers require clear evidence that systems have been applied correctly. Across London, we provide structured QA documentation to support inspection, approval, and long-term asset records.
In West Ham, across London, our projects range from commercial fit-outs to large new-build structures, working alongside multi-disciplinary teams to deliver compliant, well-coordinated fire protection systems.
In West Ham, our focus is on doing things properly, not just quickly. Across London, clients rely on us for dependable delivery, technical accuracy, and fire protection systems that stand up to inspection and scrutiny.



