



We measure steel sections, assess substrate condition and determine fire-rating requirements. Environmental factors and existing coatings are evaluated to inform specification.
Substrate is prepared using the appropriate method—dry ice blasting, shot blasting, mechanical abrasion or cleaning—to ensure adhesion and coating integrity.
Multi-coat systems are applied with continuous WFT monitoring. Environmental conditions are logged throughout to maintain performance standards.
Final WFT verification, product traceability records and compliance documentation are issued. Your project is signed off and ready for building control approval.
Our fire protection services in Palmers Green, London are designed to support projects where safety, compliance, and quality are critical. We work closely with main contractors, consultants, and facilities teams to ensure every system is installed correctly and performs as intended.
Our services include:
Every project is delivered in line with manufacturer specifications, current fire safety standards, and project-specific requirements.
NVQ qualifications supporting competent leadership and technical oversight.
SMSTS-qualified management overseeing site safety and project delivery.
NEBOSH-qualified expertise supporting our health and safety management systems.
IPAF-certified operatives ensuring safe and compliant access equipment use.

CHAS Gold demonstrates our commitment to the highest standards of health, safety, and compliance across all projects

Our apprenticeship programme develops skilled professionals through structured training pathways, supporting long term workforce capability, consistent standards, and the safe, effective delivery of our specialist services.
We take a professional, methodical approach to every project, ensuring our clients receive dependable outcomes and long-term compliance.



The cost of intumescent coatings in Palmers Green can vary depending on the required fire rating, the size and complexity of the steelwork, access conditions, and the level of surface preparation needed. Projects across London range from straightforward on-site applications to more complex schemes involving blasting, priming, and full specification control. For this reason, accurate surveying and specification are essential to producing reliable budgets.
All intumescent coating works in Palmers Green must comply with building regulations, fire test certification, and project-specific specifications. Our projects across London are delivered in line with manufacturer requirements and supported by full QA documentation, thickness records, and certification packs for building control and handover.
Fire ratings for structural steel in Palmers Green typically range from 30 to 120 minutes depending on building use, occupancy, and structural strategy. Each rating corresponds to a tested coating thickness and system build-up, which must be applied accurately to achieve the required performance.
Depending on programme and logistics, intumescent coatings in Palmers Green can be applied either on-site or off-site in controlled conditions. Across London, we regularly advise contractors on the most efficient approach based on access, programme constraints, and quality control requirements.
In Palmers Green, correct surface preparation is critical to the performance of intumescent coatings. For projects in Palmers Green and across London, we specify mechanical preparation, abrasive blasting, or dry ice blasting depending on substrate condition and system requirements.
Many of our projects in Palmers Green are delivered within live construction or refurbishment environments. We plan works around other trades, access constraints, and site operations to ensure fire protection is installed efficiently without disrupting the wider project.
In Palmers Green, fire protection works must be carefully sequenced around steel erection, follow-on trades, and finishing works. On projects in Palmers Green, we work closely with site teams to ensure our activities support the wider construction programme.
Every intumescent coating project in Palmers Green is delivered with full quality assurance, including wet film thickness measurement, environmental logging, and product traceability. This information forms part of the final certification and handover pack.
In Palmers Green, we regularly work with main contractors, steelwork contractors, project managers, and consultants across Palmers Green. Our role is to integrate specialist fire protection smoothly into the wider construction process.
Contractors across Palmers Green choose FireCoatings.co.uk for our technical control, consistent quality, and clear communication. As part of NuColour Ltd, we operate with structured QA systems, trained applicators, and full documentation on every project.



